MEMBER OF HUACHANG GROUP — CHINA CHEMICAL TOP 100
PRECISION INTEGRATION &
WORLD-CLASS ENERGY EQUIPMENT
ASME U-Stamp, DNV/ABS/BV certified manufacturer of integrated skid systems, industrial refrigeration packages, gas compression units, and pressure vessels — serving global EPC contractors since 2004.
ENGINEERING SOLUTIONS
Modular Skid Packages
Integrated Reliquefaction Units, Booster Pump Skids, and FGSS. Plug-and-play multi-discipline assembly: mechanical, E&I, and control logic.
Gas Compression Packages
BOG, Fuel Gas Booster, and PSA Tail Gas compressor packages. Oil-injected screw technology aligned with API 619 and ISO 10440-1.
Industrial Refrigeration Skids
High-efficiency screw compressor packages for Ammonia, Propylene, and Brine cooling. Capacities up to 23,300 kW.
Heat Exchangers (TEMA)
TEMA-compliant Shell & Tube exchangers, falling film evaporators, and reboilers. Titanium, Duplex, and Nickel alloys. Up to 339 bar.
Pressure Vessels (ASME/PED)
ASME U-stamped separators, absorbers, and high-pressure reactors (PED 2014/68/EU conformity per project). 600+ PQR qualifications. Full material traceability.
CERTIFICATIONS & STANDARDS
All equipment manufactured under internationally recognized codes with full material traceability and third-party inspection. PED 2014/68/EU, CRN and DOSH are available per project.
| Category | Certifications | Scope |
|---|---|---|
| Pressure Equipment | ASME U | Design & fabrication (Section VIII Div. 1) |
| Management Systems | ISO 9001, ISO 14001, ISO 45001 | Quality, Environmental, Health & Safety |
| Classification Societies | DNV / ABS / BV / LR / NK / CCS | Marine type approval & unit certification |
| Regional | KGS, GB A2 | Korea, China PV licenses |
PROJECT REFERENCES
158 delivered projects across 50+ countries — heat exchangers, pressure vessels, refrigeration systems, compressor packages, and modular skids.
60+ Modular Skids for LNG/LPG Carriers
Reliquefaction units, CIP packages, booster pump skids, and methanol fuel systems. Unit weight up to 23,600 kg. Full mechanical + E&I + controls integration.
138.5-Ton Duplex Column & Falling Film HEX
6 units including 138.5-ton isomer distillation column and falling film reboilers in Duplex 2205. ASME U-Stamp + IBR certified for India’s bioplastics project.
PED CE Inconel 825 Steam Generator
High-nickel alloy steam generator for hydrogen production. Inconel 825 construction with ASME U-Stamp + PED/CE dual certification. Exported to Czech Republic.
30+ Brine Chillers & Direct Cooling Systems
Industrial refrigeration across MDI, TDI, polycarbonate, PMMA, and specialty chemical lines. R717, R1270, R134a refrigerants. 200–3,500 kW capacity range.
8 BOG Compression Units — Self-Designed
Lmart-designed BOG compression units for 14,000 TEU LNG dual-fuel container ships. 2 units per ship × 4 hulls. Turnkey: design, manufacture, and after-sales. ABS classed.
29+ Offshore Process Skids & Equipment
Separators, hydrocyclones, flow meters, valve boxes, refrigeration units, and CCUS systems for offshore platforms. CCS and DNV class approved.
LATEST INSIGHTS
Technical articles, project case studies, and EPC procurement best practices.
- Meet Lmart at ADIPEC 2026: From Process Duty to Packaged Delivery
Meet Lmart at ADIPEC 2026, Stand 15163, 2–5 November in Abu Dhabi. Discuss refrigeration, gas compression, pressure vessels and heat exchangers. - Modular Process Skid Manufacturer: From Design Review to FAT for Oil & Gas and Marine Skids
Blog / Buyer's Playbook Buyer's Guide 30 min read October 9, 2026 Modular Process Skid Manufacturer: From Design Review to ... Read more - Falling Film Evaporator Manufacturer — Selection & Supply
Blog / Buyer's Playbook Buyer's Guide 30 min read October 14, 2026 Falling Film Evaporator Manufacturer: How to Evaluate Selection, ... Read more - Offshore Refrigeration Delivery: From Suzhou Works to Brazilian Platforms
What long-range offshore delivery actually requires — standard alignment, preservation, sea-fastening, lifting pre-study, and remote support — drawn from delivered Brazil offshore programs via Johnson Controls. - Skid E&I Integration: Five Design Principles for PLC-to-DCS Interfaces
The five principles that keep skid control integration from becoming commissioning debt: interface definition, signal protocol discipline, tag consistency, cable separation, and FAT that verifies the actual interface. - LNG Bunkering Station Skids: Equipment on the Fuel Transition Path
LNG bunkering infrastructure — ship-to-ship, shore-to-ship, and the station-side equipment chain. What the skids contain, how the safety systems interlock, and what has actually been delivered.
REQUEST A QUOTATION
Share your process datasheet or specifications — our engineers will provide a technical proposal within 48 hours.