ASME & PED SHELL AND TUBE HEAT EXCHANGER
EPC DELIVERY GUIDE
As a specialized shell and tube heat exchanger manufacturer, Lmart Energy streamlines your procurement with a pre-validated "Scope–ITP–VDB" framework for refinery and chemical plant projects worldwide.
EXPERTISE & COMPLIANCE
Bridging process simulation and physical delivery.
We are an experienced ASME heat exchanger vendor, manufacturing high-performance TEMA shell and tube heat exchangers. Whether your project requires a floating head heat exchanger, a fixed tubesheet design, or a U-tube configuration, we ensure 100% code compliance including EU PED requirements.
- ASME BPVC Section VIII Div. 1 — U Stamp certified
- TEMA Class R (Refinery) / B / C configurations
- PED 2014/68/EU — CE marking with Notified Body
- HTRI thermal design validation for every unit
FAT / INSPECTION READINESS
- 100% FAT success rate across all recent deliveries
- Zero document rejections on last 12 projects
- BV / TÜV / Lloyds 3rd party witness coordination
- 48 hr technical proposal turnaround
ENGINEERING SCOPE & BATTERY LIMITS
Clear vendor vs. EPC scope split — defined at contract award.
| Task Module | Lmart Energy (Vendor) | EPC / Site Contractor | Critical Input |
|---|---|---|---|
| Process Design Thermal Sizing |
HTRI Data Validation | Thermal Datasheet Approval | Heat exchanger specification sheet |
| Mechanical Design ASME / PED Calc |
PV Elite / Compress analysis | Design review & comments | Nozzle loads, wind/seismic data |
| Structural Supports Vessel Mechanics |
Saddles / Lifting Lugs | Civil Foundations & Grouting | Local wind/seismic code data |
| Interface Management Piping & Connectivity |
Companion Flanges & Studs | Piping Isolation & Insulation | Allowable nozzle loads |
| NDE & Testing Quality Assurance |
RT/UT/MT/PT + Hydro-test | Witness / Hold-point attendance | ITP approval before production |
| Documentation Vendor Data Book |
Full VDB (MDR, MTR, WPS/PQR, NDE, Hydro) | Review & final acceptance | MDR format & document numbering |
DIGITAL MANUFACTURING QC
Transparent production monitoring for every configuration.
3D DESIGN VALIDATION
Advanced modeling ensures U-tube bundle clearance and thermal expansion integrity before production starts.
REAL-TIME VDB SYNC
Your heat exchanger specification sheet and test reports are synced instantly to the digital data book.
IoT WELD MONITORING
99.8% arc precision tracking. NDE scheduling synced to production milestones in real time.
REMOTE WITNESS
Live video inspection capability for hold-point witnesses unable to travel. Recorded and archived.
CRITICAL ITP HOLD POINTS
Mandatory inspection gates per ASME and PED requirements.
| # | Hold Point | Method |
|---|---|---|
| 1 | MTR & Material Validation | Review mill test reports vs. TEMA datasheet |
| 2 | Tube-to-Tubesheet Weld | LP / MT testing for leak-proof integrity |
| 3 | Dimensional Inspection | Nozzle orientation, shell roundness, bundle fit |
| 4 | NDE (RT/UT/MT/PT) | Per ASME V + project-specific requirements |
| 5 | Code Hydrostatic Test | ASME / PED 3rd party witness — mandatory hold |
| 6 | Final Inspection & Packing | N₂ purge + VCI protection + ISPM-15 cradles |
PROJECT DELIVERY ROADMAP
How we execute complex shell and tube projects with precision.
| Phase | Milestone | Deliverable | Duration |
|---|---|---|---|
| 01 | Contract Execution | PO, approved TEMA datasheet, MDR format | Week 0 |
| 02 | IFA Design Review | GA drawing, thermal datasheet, nozzle loads | Week 2–3 |
| 03 | AFC Construction | AFC drawings, material procurement, WPS approval | Week 4–6 |
| 04 | Fabrication & FAT | Welding, NDE, hydro-test, dimensional check | Week 7–14 |
| 05 | Shipment & VDB | Packing, shipping marks, final VDB release | Week 15–16 |
PROJECT EVIDENCE
Manufacturer references and case proofs.
Floating Head Refining Unit
High-pressure floating head heat exchanger system for oil refinery expansion. Full ASME U-Stamp certification. Coordinated with Air Products and international EPC.
- 100% FAT success — zero document rejection
- BV 3rd party witness coordination
- Full digital VDB delivered within 48 hrs of shipment
U-TUBE CHEMICAL COOLER
Titanium units for corrosive acid service.
Customized TEMA Design + PED Compliance
Fabricated titanium U-tube units for BASF corrosive acid service. Customized TEMA shell and tube heat exchanger design with full PED certification and Notified Body involvement.
- Extended design life with Ti Grade 2 tubes
- Full digital VDB with EN 10204 3.1/3.2 MTRs
- PED Module H — full QA system certification
RELATED PAGES
Explore Lmart's heat exchanger capabilities and standards resources.
Heat Exchangers (TEMA)
Full product overview — shell and tube configurations, materials, and specifications.
Titanium Heat Exchangers
110+ Ti units delivered to the customer and TGE Marine.
TEMA Standards Guide
TEMA units, datasheet expectations, and class R/B/C selection criteria.
ASME U-Stamp Guide
ASME Section VIII Division 1 requirements and U-Stamp certification process.
Project Support & FAQ
Can Lmart coordinate ASME & PED 3rd party witnesses?
Yes. We coordinate with Bureau Veritas, TÜV, and Lloyds for both ASME Authorized Inspection and PED Notified Body (NoBo) requirements. Our ITP workflow provides clear notification windows for EPCs to arrive for hold-point witness.
What is the standard shipping protection for export?
All units are internal nitrogen purged with VCI (Vapor Corrosion Inhibitors) added. Nozzles are sealed with metal blind flanges and heavy-duty rubber gaskets. Cradles are ISPM-15 certified fumigated timber. Export packing per EPC specifications.
What TEMA configurations does Lmart manufacture?
We manufacture all standard TEMA types: fixed tubesheet (BEM, AEL, NEN), floating head (AES, AET, AEP), U-tube (BEU, AEU), and kettle reboiler (AKT). Classes R (refinery), C (general chemical), and B (chemical service). All designs validated with HTRI software.
What is the typical lead time for an EPC heat exchanger order?
Standard TEMA units: 14–18 weeks from AFC drawings. Complex units with exotic materials (titanium, Hastelloy, duplex) or PED Module H certification: 18–24 weeks. Lead time is confirmed at contract award and tracked via our digital milestone dashboard.
How is the Vendor Data Book (VDB) delivered?
The VDB is compiled digitally throughout production and delivered as a structured PDF package within 48 hours of final inspection. Contents include: MDR compliance matrix, all MTRs (EN 10204 3.1/3.2), WPS/PQR, NDE reports, hydro-test records, dimensional reports, and class certificates.
Does Lmart support remote inspection and digital witness?
Yes. We offer live video inspection for hold-point witnesses unable to travel. All sessions are recorded and archived in the digital VDB. Our IoT weld monitoring system provides real-time quality data accessible remotely.